Jembatan Dames Point



Panjang3.245,00 m
Lebar32,00 m
Bentang Terpanjang396,00 m
Kondisi UmumAktif
Jenis JembatanCable Stayed
Tanggal Mulai1985
Tanggal Selesai1989
Tanggal Peresmian10 Maret 1989
NegaraUnited States of America
Latitude (GPS)30.3858000000000000
Longitude (GPS)-81.5574000000000300

The Dames Point Bridge (officially the Napoleon Bonaparte Broward Bridge) is a cable-stayedbridge over the St. Johns River in Jacksonville, Florida on the Interstate 295 East Beltway. Construction began in 1985 and it was completed in 1989. The main span is 1,300 feet (396.2 m), and is 175 feet (53.3 m) high. The bridge was designed by HNTB Corporation and built by Massman Construction Company. The bridge carries Interstate 295 which makes it become part of the bridges on the interstate highway system.

History

Until the completion of the Sidney Lanier Bridge in Brunswick, Georgia in 2003, it was the only bridge in the United States to feature the harp (parallel) stay arrangement. The cables are arranged on multiple vertical planes, making a slight modification to the harp arrangement.[1] Main span cables are paired to anchor into the tower in a vertical plane. Side span cables pair up to anchor in a horizontal plane. By doing this, four cables anchor in the tower at approximately the same elevation.

The Dames Point Bridge is one of the largest cable-stayed bridge built in the United States.[1][2] It has 21 miles (34 km) of cable.


Sumber :
http://en.wikipedia.org/wiki/Dames_Point_Bridge